Senator Beck Stream Gauge

 

 

A view from above of the broad-crested, notched weir during spring runoff in May 2004. The weir has a design capacity approaching 40 cfs and is equipped with a staff gauge. Automated sensor measurements include stage height (Druck™ PDCR 1830-8388 transducer) and water conductivity and temperature (Campbell Scientific™ CS547A). Data is logged on a Campbell Scientific™ CR10X and accessed via RF link.
 
 

| BACK | HOME |

Copyright © CSAS, 2003
All Rights Reserved